M logo

Data Center Construction - Mid - Senior Commissioning Project Manager

MGACCharleston, SC

$110,000 - $160,000 / year


Overview

Schedule
Full-time
Career level
Director
Remote
On-site
Compensation
$110,000-$160,000/year
Benefits
Paid Holidays
Paid Vacation
Paid Sick Leave

Job Description

It's an exciting time to join MGAC!

MGAC is a global boutique consultancy dedicated to managing and representing our clients' best interests. Our success is rooted in hiring exceptional people who are driven to do challenging work with the unique blend of experience, integrity, creativity, and commitment that separates us from our competitors.

We have three simple goals: to do the most interesting and challenging work, to have fun working together, and to build a successful business in the process.

This position requires significant onsite presence in Charleston, SC with travel required based on project and client needs.

Unlock Your Potential

We're looking for candidates eager to lead complex mission-critical projects, influence project outcomes, and drive operational excellence across large-scale data center developments. Here's what will set you up for success at MGAC:

  • 5+ years of experience in commissioning, construction management, mission-critical facilities, or data center infrastructure projects.
  • 3+ years of experience managing commissioning teams, consultants, and multidisciplinary project stakeholders.
  • Bachelor's degree in Engineering, Construction Management, Mechanical Engineering, Electrical Engineering, or a related technical field. Equivalent experience will be considered.
  • Extensive experience supporting hyperscale, colocation, enterprise, or mission-critical data center construction projects.
  • Experience leading Level 1-5 commissioning activities for complex MEP and critical infrastructure systems.
  • Strong knowledge of electrical distribution, UPS systems, generators, HVAC systems, controls, BMS, EPMS, SCADA, and integrated systems testing.
  • Excellent analytical, organizational, leadership, problem-solving, presentation, interpersonal, verbal, and written communication skills.
  • Proven ability to manage multiple projects simultaneously while balancing schedule, budget, risk, quality, and client expectations.
  • A collaborative leader who thrives in fast-paced environments and is passionate about delivering exceptional project outcomes.

What You'll Be Doing

MGAC's Critical Environments team manages some of the most complex and high-profile data center projects in the industry. As a trusted owner's representative, we help clients navigate technical challenges, mitigate risks, and ensure facilities are delivered ready for operations. As a Data Center Construction- Mid- Senior Commissioning Project Manager  you will lead commissioning strategy and execution across large-scale mission-critical projects and serve as a key advisor to clients throughout the project lifecycle.

Commissioning Leadership

  • Lead and manage commissioning teams including Commissioning Managers, Engineers, Project Managers, and third-party commissioning partners.
  • Oversee commissioning activities across multiple concurrent data center construction projects.
  • Develop commissioning strategies, resource plans, project schedules, and execution methodologies.
  • Provide technical leadership throughout design, construction, testing, and turnover phases.
  • Mentor and develop team members while promoting a culture of quality, accountability, and safety.

Commissioning Program Delivery

  • Direct the full lifecycle of Level 1-5 commissioning activities.
  • Review and approve commissioning plans, scripts, procedures, reports, and turnover documentation.
  • Oversee equipment start-up, functional performance testing, integrated systems testing (IST), load bank testing, and operational readiness activities.
  • Develop and maintain commissioning logs, deficiency logs, equipment checklists, SOPs, MOPs, and project documentation.
  • Ensure consistency and compliance with company quality processes and commissioning standards.

Technical Oversight

  • Lead commissioning efforts for critical infrastructure systems, including:
  • Electrical distribution systems
  • Medium- and low-voltage power systems
  • UPS systems and battery plants
  • Standby generators and fuel systems
  • Chillers and cooling plants
  • CRAH and CRAC units
  • Building Management Systems (BMS)
  • EPMS and SCADA systems
  • Fire alarm and life safety systems
  • Emergency power systems
  • Review design documents, specifications, shop drawings, and equipment submittals for commissioning requirements.
  • Support troubleshooting, issue resolution, and deficiency management during testing and startup activities.
  • Verify testing results and ensure systems meet owner project requirements and operational objectives.

Client Relationship Management

  • Serve as a trusted advisor and primary commissioning lead for clients and project stakeholders.
  • Facilitate commissioning meetings, project reviews, and progress reporting.
  • Coordinate activities among contractors, consultants, vendors, equipment manufacturers, and owner representatives.
  • Proactively identify project risks and develop mitigation and recovery strategies.
  • Maintain the client's vision while ensuring successful project delivery.

Our Critical Environments project work continues to experience tremendous growth, with a robust pipeline of hyperscale, colocation, and mission-critical projects across North America.

Why Work With Us?

  • 30+ years strong in North America and growing fast with a positive, energizing culture.
  • Consistently recognized as a Top Workplace with a true employee-first mindset.
  • Entrepreneurial spirit encouraged. Bring fresh ideas and exceed client expectations.
  • Global reach, yet agile and client-focused like a boutique firm.
  • Your voice matters. Flat structure, open doors, and recognition for your contributions.
  • Exposure to some of the most complex and innovative data center projects in the industry.
  • Strong work-life balance, generous PTO, and top-tier wellness benefits.

Beyond the Paycheck: Discover Our Benefits

  • Recognized as a Top Workplace for over a decade.
  • Vacation starts on day one. Accrue 3 weeks per year, plus a paid birthday off.
  • 8 sick days and 9 paid holidays annually for full-time employees.
  • Competitive benefits that support both personal and professional growth.
  • Professional development opportunities and support for industry certifications.

Salary Range

$110,000-$160,000 per year (commensurate with experience)

The advertised salary range is intended as a general guideline and may vary based on factors such as experience, expertise, certifications, and location. This base salary does not reflect the full compensation package, which may include bonuses, a 401(k) match, and other benefits.

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.

pay-wall

FAQs About Data Center Construction - Mid - Senior Commissioning Project Manager Jobs at MGAC

What is the work location for this position at MGAC?
This job at MGAC is located in Charleston, SC, according to the details provided by the employer. Some roles may also include multiple work locations depending on the requirement.
What pay range can candidates expect for this role at MGAC?
Candidates can expect a pay range of $110,000 and $160,000 per year.
What employment applies to this position at MGAC?
MGAC lists this role as a Full-time position.
What experience level is required for this role at MGAC?
MGAC is looking for a candidate with "Director" experience level.
What benefits are offered by MGAC for this role?
MGAC offers following benefits: Paid Holidays, Paid Vacation, Paid Sick Leave, and Career Development for this position. Actual benefits may vary depending on the employer's policies and employment terms.
What is the process to apply for this position at MGAC?
You can apply for this role at MGAC either through Sonara's automated application system, which helps you submit applications 10X faster with minimal effort, or by applying manually using the direct link on the job page.