Peyton Resource Group logo

Data Center Construction Manager (Isp)

Peyton Resource GroupColumbus, OH

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.1

Reclaim your time by letting our AI handle the grunt work of job searching.

We continuously scan millions of openings to find your top matches.

pay-wall

Job Description

Position: Data Center Construction ManagerPosition Details
  • Exempt, salaried position based on experience and skill level
  • Employment type: Contract with potential for extension or full-time conversion
  • Standard site hours: Monday–Friday, 7: 00 AM to ~3: 30–5: 00 PM (after-hours and weekend work as needed)
  • Location: Fully onsite at a project site in New Albany, Ohio
  • Travel: Up to 15%–50% depending on project needs
  • Direct supervision responsibilities included
  • Interview process: Up to three 45-minute virtual interviews (Program Leadership & HR)
Position OverviewWe are seeking an experienced Data Center Construction Manager to lead large-scale, complex infrastructure projects. This is a senior onsite leadership role responsible for managing all phases of construction execution—from planning through commissioning and closeout.The ideal candidate brings deep expertise in structured cabling, low-voltage systems, and fiber installations, along with a strong ability to lead large field teams and deliver projects safely, on time, and to high-quality standards.Key ResponsibilitiesSafety Leadership
  • Champion a safety-first culture and ensure compliance with OSHA and site-specific requirements
  • Lead job site safety initiatives, incident investigations, and continuous improvement efforts
Construction & Project Execution
  • Develop and execute project plans, installation strategies, and site logistics
  • Maintain and manage 5-week look-ahead schedules, labor forecasts, and daily progress tracking
  • Oversee field operations to meet production goals, budgets, and schedule milestones
  • Coordinate with project management and procurement for material delivery and staging
Technical Oversight
  • Serve as the subject matter expert for data center low-voltage, structured cabling, and fiber systems
  • Ensure compliance with industry standards (ANSI/TIA, BICSI, NEBS) and project specifications
  • Lead testing and commissioning efforts (OTDR, power meter validation, labeling standards)
  • Manage RFIs, change orders, and resolve design or field conflicts
Team Leadership & Development
  • Lead and manage large field teams (60–100+ technicians)
  • Oversee hiring, training, and performance evaluations
  • Provide mentorship and technical guidance to improve team performance and quality
  • Foster a culture of accountability, safety, and collaboration
Client & Stakeholder Coordination
  • Act as the primary onsite point of contact for construction operations
  • Participate in site meetings, walkthroughs, and milestone reviews
  • Proactively address project challenges, delays, and execution issues
Required Qualifications
  • 3–5+ years of relevant supervisory experience in construction or structured cabling environments
  • Experience managing large field teams (60–100+)
  • Strong knowledge of data center environments (new builds or retrofits preferred)
  • Working knowledge of fiber testing (including OTDR) and ISP-related audits
  • Experience with change management processes and RFIs
  • Proficiency with MS Office, Bluebeam, Primavera P6, and performance tracking metrics (SPI/CPI)
  • Strong understanding of:
    • Cabling standards, labeling, and documentation
    • Rack/stack installations and infrastructure layouts
    • Quality control and punch-list management
    • Preventative maintenance and inspections
    • Vendor and cross-trade coordination
Preferred Qualifications
  • 10+ years of construction management experience, including 5+ years in data center environments
  • Experience supporting both new construction and retrofit projects
  • Familiarity with union labor environments (not required)
Certifications (Preferred or Required Upon Hire)
  • OSHA 30 (or ability to obtain within 6 months)
  • BICSI Technician (TECH)
  • BICSI RCDD
  • Additional cabling and network certifications
Additional Responsibilities
  • Direct onsite technicians performing rack, stack, and cabling work
  • Coordinate structured cabling installations, reroutes, and clean-up efforts
  • Monitor workmanship quality, labeling accuracy, and pathway management
  • Conduct daily walkthroughs to identify risks, inefficiencies, or issues
  • Support build-outs and expansions in both fixed and modular/containerized facilities
  • Perform and support onsite audits

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.

pay-wall

FAQs About Data Center Construction Manager (Isp) Jobs at Peyton Resource Group

What is the work location for this position at Peyton Resource Group?
This job at Peyton Resource Group is located in Columbus, OH, according to the details provided by the employer. Some roles may also include multiple work locations depending on the requirement.
What pay range can candidates expect for this role at Peyton Resource Group?
Employer has not shared pay details for this role.
What employment applies to this position at Peyton Resource Group?
The employer has not provided this information. This may be discussed during the hiring process.
What is the process to apply for this position at Peyton Resource Group?
You can apply for this role at Peyton Resource Group either through Sonara's automated application system, which helps you submit applications 10X faster with minimal effort, or by applying manually using the direct link on the job page.