M logo

Data Center Construction Project Manager | Austin, TX

Michael Page InternationalAustin, TX

$120,000 - $140,000 / year

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.1

Reclaim your time by letting our AI handle the grunt work of job searching.

We continuously scan millions of openings to find your top matches.

pay-wall

Overview

Remote
On-site
Compensation
$120,000-$140,000/year

Job Description

Job TitleWorking for an industry leading Texas based Design Build firm

Pipeline of Central Texas based tilt wall/big box projects

About Our ClientTexas based Design Build Firm that is rapidly growing throughout TexasStrong light industrial project pipeline with a focus on production facilities, distribution centers, manufacturing facilities, and data centers

Received numerous construction awards for their distribution centers

Job DescriptionRunning the scheduling from project inception to finish

Manage financial aspects including estimating, budgets, and cost reports

Conduct weekly meetings and communicate daily with the Superintendent and construction team

Maintain a safe work environment

Train and develop the project team

Manage subcontractor schedules and quality of work

Read and interpret plans, proposals and other documentation to create bids

Track and analyze data to reduce gaps between estimates and actual costs

Obtain and track subcontract bids and negotiate budgets

Prepare and present estimate documentation, including gaps in available data

Prepares estimates according to the requirements of multiple delivery systems. Reviews quotes and estimates with the project management team

Assists with certain post-bid buyouts

Initiates and participates in meet and greet presentations with subcontractors and suppliers

Comprehends contract requirements for diversity complianceMPI does not discriminate on the basis of race, color, religion, sex, sexual orientation, gender identity or expression, national origin, age, disability, veteran status, marital status, or based on an individual's status in any group or class protected by applicable federal, state or local law. MPI encourages applications from minorities, women, the disabled, protected veterans and all other qualified applicants.The Successful Applicant8+ years in Commercial Construction specializing in data center and tilt wall projects

Must have data center project experience

Strong oral communication and written skills

Ability to read and understand technical specifications, blueprints, technical manuals, product/material installation instructions and engineering/architectural drawings

Collaboration with other Project Managers and the Team to develop, refine, and update project schedules to ensure all milestones are identified and tracked

What's on OfferCompetitive Base SalaryBonus StructureAllowancesBenefitsInsurances401K

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.

pay-wall

FAQs About Data Center Construction Project Manager | Austin, TX Jobs at Michael Page International

What is the work location for this position at Michael Page International?
This job at Michael Page International is located in Austin, TX, according to the details provided by the employer. Some roles may also include multiple work locations depending on the requirement.
What pay range can candidates expect for this role at Michael Page International?
Candidates can expect a pay range of $120,000 and $140,000 per year.
What employment applies to this position at Michael Page International?
The employer has not provided this information. This may be discussed during the hiring process.
What is the process to apply for this position at Michael Page International?
You can apply for this role at Michael Page International either through Sonara's automated application system, which helps you submit applications 10X faster with minimal effort, or by applying manually using the direct link on the job page.