C logo

Senior Construction Scheduler


Overview

Schedule
Full-time
Education
Engineering (PE)
Career level
Senior-level
Remote
On-site
Benefits
Health Insurance
Dental Insurance
Vision Insurance

Job Description

Description

CLMI Group is looking for passionate construction professionals to join our team! We value ambition, dedication, and innovation, and believe in building a network of talented individuals who share our commitment to making a difference.

Position Title: Senior Regional Construction Scheduler

Location: Los Angeles Unified School District

Due Date: Continuous until positions are filled 

Duties:

  • Reporting directly to the Sr Construction Manager for Scheduling and Estimating and provides updates and prepares reports for upper management in order to meet Key Performance Indicators.
  • Supervise Project Schedulers to ensure project timelines are met and interfaces with OARs, Senior Project Managers and other site staff and contractors related to the review of CPM schedules, preparation of project scope and budget.
  • Projects staffing needs and makes recommendations to executive staff to improve staff requirements.
  • Develops and maintains program schedules identifying relationships, logic, milestones, and constraints for construction projects of various types.
  • Independently interprets and reads detailed construction drawings (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil, etc.) and develops a clear understanding of work scope.
  • Reviews Contractor’s Baseline schedule submissions and verifies that all work scope is identified properly and logically sequenced correctly; provides written detailed schedule review comments.
  • Performs QA/QC on contractor schedule submittals for conformance with contract terms; reviews critical path, cost loading, resource loading of man-hours, schedule content, recovery schedules, use of logic relationships and lags, constraints and milestones.
  • Performs schedule Time Impact Analysis for any change orders that affect the construction schedule; conducts schedule negotiations with the OAR and the contractor for any delay time settlements.
  • Reads drawings to determine if work is in or out of scope, and understands terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Performs Critical Path analysis and Earned Value analysis.
  • Walks the construction sites as needed and checks the contractor’s weekly/monthly schedule progress; provides reports to the project OAR and upper management.
  • Effectively communicates with the Contractor regarding all schedule/progress related matters and concerns in the weekly status meetings and all other schedule related meetings.
  • Performs Program Schedule QA/QC reviews on a regular basis.
  • Performs status updates for Program Schedules/Master Schedules on a bi-monthly basis.
  • Prepares reports as needed and directed by Management.
Requirements

Minimum Requirements:

Required Experience:

  • Minimum eight (8) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects.
  • Proficiency in Primavera Latest Version and MS Office Suite

Required Education: 

  • Graduation from a recognized college or university with a bachelor’s degree in architecture, engineering or construction management.

OR

  • Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional two (2) years of experience in the duties above to compensate for the required education.

Required Skills:

  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build efficient working relationships with project teams and department staff
  • Understanding of theories, principles and practices of cost engineering, scheduling and schedule forensics

Offered rate of compensation will be based on a variety of non-discriminatory factors, including education, qualifications, experience, and geographic location.

Benefits
  • Health Care Plan (Medical, Dental & Vision)
  • Retirement Plan (401k)
  • 401k Matching
  • Paid Time Off (Vacation, Sick & Public Holidays)
  • Short Term / Long Term Disability / Life

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.

pay-wall

FAQs About Senior Construction Scheduler Jobs at CLMI Group

What is the work location for this position at CLMI Group?
This job at CLMI Group is located in Los Angeles, California, according to the details provided by the employer. Some roles may also include multiple work locations depending on the requirement.
What pay range can candidates expect for this role at CLMI Group?
Employer has not shared pay details for this role.
What employment applies to this position at CLMI Group?
CLMI Group lists this role as a Full-time position.
What experience level is required for this role at CLMI Group?
CLMI Group is looking for a candidate with "Senior-level" experience level.
What education level is required for this job?
The education requirement for this position is Engineering (PE). Candidates with relevant qualifications or equivalent experience may also be considered.
What benefits are offered by CLMI Group for this role?
CLMI Group offers following benefits: Health Insurance, Dental Insurance, Vision Insurance, Disability Insurance, Life Insurance, and Paid Vacation for this position. Actual benefits may vary depending on the employer's policies and employment terms.
What is the process to apply for this position at CLMI Group?
You can apply for this role at CLMI Group either through Sonara's automated application system, which helps you submit applications 10X faster with minimal effort, or by applying manually using the direct link on the job page.