HDR, Inc. logo

Senior Construction Scheduler

HDR, Inc.Bellevue, WA

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.1

Reclaim your time by letting our AI handle the grunt work of job searching.

We continuously scan millions of openings to find your top matches.

pay-wall

Overview

Schedule
Full-time
Education
Engineering (PE)
PMP
Career level
Senior-level

Job Description

At HDR, our employee-owners are fully engaged in creating a welcoming environment where each of us is valued and respected, a place where everyone is empowered to bring their authentic selves and novel ideas to work every day. As we foster a culture of inclusion throughout our company and within our communities, we constantly ask ourselves: What is our impact on the world?

Watch Our Story:' https://www.hdrinc.com/our-story'

We believe transportation is more than movement, it's the foundation of connected, thriving communities. As part of HDR's Transportation Business Group, you'll help shape the systems that move people and goods safely, efficiently, and sustainably. From designing resilient highways and iconic bridges to advancing transit, passenger and freight rail, aviation, federal transportation ports and marine infrastructure, your work will directly support economic vitality, public safety, sustainable and resilient communities and quality of life. We bring together planners, engineers, architects, construction management staff, environmental, strategic communications, economists, management consultants and specialists across disciplines to solve complex mobility challenges with innovation, technical excellence, and a deep understanding of community needs. Whether you're modernizing aging infrastructure or pioneering next-generation transportation solutions, your contributions will help define the future of mobility. This isn't just a job, it's a chance to lead progress, drive meaningful impact, and leave a legacy of smarter, more connected transportation networks. We are all employee-owners at HDR, which is the foundation of our collaborative culture that connects employees around the world.

Each and every role throughout our organization makes a difference in our ability to change the world for the better. Read further to learn how you could help make great things possible not only in your community, but around the world.

In the role of Senior Construction Scheduler, we'll count on you to:

  • Assist the Project Manager with planning and monitoring all aspects of major transportation or industrial projects, with high energy and great attention to detail
  • Prepare base schedules, schedule reviews, monthly schedule update analysis, time impact analysis, and investigation and analysis of schedule impacts
  • Monitor and document construction progress
  • Identify, track and assist in resolution of construction issues/conflicts
  • Act as liaison between the client, contractors or designers concerning construction issues/conflicts and plan revisions
  • Monitor, review and report to the Project Manager and/or clients on the status of schedules with regard to construction contract schedule compliance with the construction contract specifications, and review and provide written summary progress reports stating acceptability or unacceptability of the schedules
  • Perform other duties as needed

Preferred Qualifications

  • Ability to interpret construction schedules
  • Cost control background
  • Certifications (one or more): CST, CCT, CMIT, CDT, PSP, EVP, PMI-SP, PMP, CCM, EIT, PE

Required Qualifications

  • Bachelor's degree
  • A minimum of 10 years Construction Scheduling
  • Proficiency in using Primavera, and/or other scheduling software
  • Experience with cost and resource loaded schedules required
  • An attitude and commitment to being an active participant of our employee-owned culture is a must
  • Sponsorship (visa) for US employment authorization is not available now or in the future for this position

What We Believe

HDR is our company. Together, we build on each other's life experiences and perspectives to make great things possible every day. This shapes our collaborative culture, encourages organizational trust and connects us closer to the clients and communities we serve.

Our Commitment

As employee owners, we all have a role in creating an inclusive environment where each of us is welcomed, valued, respected and empowered to bring our authentic selves to work every day.

Our eight Employee Network Groups (Asian Pacific, Black, Hispanic/Latino(a), LGBTQ , People with Disabilities, Veterans, Women, Young Professionals) help create a sense of belonging and foster a supportive environment where everyone is empowered to engage and contribute. Each group has an executive sponsor and is open to all employees.

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.

pay-wall

FAQs About Senior Construction Scheduler Jobs at HDR, Inc.

What is the work location for this position at HDR, Inc.?
This job at HDR, Inc. is located in Bellevue, WA, according to the details provided by the employer. Some roles may also include multiple work locations depending on the requirement.
What pay range can candidates expect for this role at HDR, Inc.?
Employer has not shared pay details for this role.
What employment applies to this position at HDR, Inc.?
HDR, Inc. lists this role as a Full-time position.
What experience level is required for this role at HDR, Inc.?
HDR, Inc. is looking for a candidate with "Senior-level" experience level.
What education level is required for this job?
The education requirement for this position includes Engineering (PE) and PMP. Candidates with relevant qualifications or equivalent experience may also be considered.
What is the process to apply for this position at HDR, Inc.?
You can apply for this role at HDR, Inc. either through Sonara's automated application system, which helps you submit applications 10X faster with minimal effort, or by applying manually using the direct link on the job page.