Procon Consulting logo

Senior Construction Scheduler - Federal Sector

Procon ConsultingWashington, DC

Overview

Schedule
Full-time
Career level
Senior-level
Remote
On-site
Benefits
Health Insurance
Dental Insurance
401k Matching/Retirement Savings

Job Description

Procon is a top-ranked construction management and technology consulting firm with 25 years of experience delivering high‑impact projects across the U.S. and worldwide. An ENR Top 100 CM/PM firm for five consecutive years, we specialize in program management, project controls, commissioning, and technology—and offer an excellent platform to grow your career while shaping the future of the built environment.

Procon seeks a Senior Scheduler. This role requires various skills and experience as listed below.

This position does not offer employment visa sponsorship. Candidates must be authorized to work in the United States without current or future sponsorship.

Requirements

Qualifications and Skills

  • Expertise in Primavera P6 with demonstrated proficiency in building and analyzing Critical Path Method (CPM) schedules.
  • Minimum of 10 years of experience in construction scheduling, with a strong track record in CPM methodologies.
  • Deep understanding of federal government construction processes, including contracts, design documents, and specifications.
  • Experience supporting vertical construction, utility, and infrastructure projects.
  • Familiarity with large-scale or complex scheduling environments, including development and assessment of Integrated Master Schedules and detailed analysis of TIAs and COs.
  • Strong verbal and written communication skills for effective stakeholder engagement and reporting.
  • Bachelor’s degree required in construction management, engineering, or a related field.
  • Preferred but not required: certifications in scheduling, general contractor experience, and working knowledge of Microsoft Project (MSP), Schedule Validator, Primavera Risk Analysis, or a relevant master’s degree.

Responsibilities and Duties

  • Develop and manage complex Integrated Master Schedules (IMS), including look-ahead planning and “what-if” scenario modeling.
  • Evaluate construction schedules for compliance, performance, and risk, including thorough assessments of Time Impact Analyses (TIA) and Change Orders (CO).
  • Collaborate cross-functionally to align scopes of work across concurrent projects.
  • Deliver timely and insightful reporting by synthesizing data from various sources and communicating scheduling impacts across program stakeholders.
  • Participate proactively in project lifecycle activities—such as design reviews, procurement strategy sessions, and coordination meetings—to maintain a deep understanding of project and program dynamics.
  • Provide onsite support when needed, with occasional travel and the potential to work from alternate project offices in the future.

Benefits

Salary commensurate with experience.

Interested and qualified candidates please submit a cover letter and a resume.

Procon offers competitive salaries and a comprehensive benefits package, including full medical/dental insurance and 401(K) plan. Procon is an equal opportunity employer and considers qualified applicants for employment without regard to race, gender, age, color, religion, disability, veteran status, sexual orientation, or any other protected factor

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.

pay-wall

FAQs About Senior Construction Scheduler - Federal Sector Jobs at Procon Consulting

What is the work location for this position at Procon Consulting?
This job at Procon Consulting is located in Washington, DC, according to the details provided by the employer. Some roles may also include multiple work locations depending on the requirement.
What pay range can candidates expect for this role at Procon Consulting?
Employer has not shared pay details for this role.
What employment applies to this position at Procon Consulting?
Procon Consulting lists this role as a Full-time position.
What experience level is required for this role at Procon Consulting?
Procon Consulting is looking for a candidate with "Senior-level" experience level.
What benefits are offered by Procon Consulting for this role?
Procon Consulting offers following benefits: Health Insurance, Dental Insurance, 401k Matching/Retirement Savings, and Health & Wellness Programs for this position. Actual benefits may vary depending on the employer's policies and employment terms.
What is the process to apply for this position at Procon Consulting?
You can apply for this role at Procon Consulting either through Sonara's automated application system, which helps you submit applications 10X faster with minimal effort, or by applying manually using the direct link on the job page.