FST Technical Services logo

Senior Mechanical Commissioning Project Engineer-Data Center Construction

FST Technical ServicesChicago, IL

$130,000 - $150,000 / year

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.1

Reclaim your time by letting our AI handle the grunt work of job searching.

We continuously scan millions of openings to find your top matches.

pay-wall

Overview

Schedule
Full-time
Education
Engineering (PE)
Career level
Senior-level
Remote
On-site
Compensation
$130,000-$150,000/year
Benefits
Career Development

Job Description

We’re excited to connect with candidates in Chicago; however, this role is based in Atlanta, GA or San Jose, CA. The position offers opportunities for travel and relocation, and we’re seeking candidates who are open to this flexibility. Please note that the role is not based in Chicago. Monthly per diem and mobilization is on offer.Lead the Systems That Keep Critical Infrastructure Running 

At FST Technical Services, we ensure the most complex facilities operate exactly as intended. Our Commissioning division partners with clients across data centers and mission-critical environments to validate that systems are designed, installed, and performing at the highest level. We are seeking a Senior Mechanical Project Engineer who brings deep technical expertise, field leadership, and the ability to drive outcomes in high-performance environments. 

Why This Role Stands Out 

This is not a documentation-driven role. This is a position for someone who: 

  • Owns system performance from design through execution 
  • Understands how complex mechanical systems operate as a whole 
  • Can identify and solve issues before they impact operations 

You will work on large-scale, mission-critical data center projects where performance, reliability, and precision are non-negotiable. 

What You will Do 

Project Leadership & Execution • Lead commissioning activities across the full lifecycle • Execute functional testing, witness testing, and system validation • Manage assignments within schedule, budget, and quality expectations Technical Expertise & Problem Solving • Evaluate HVAC, chillers, boilers, pumps, and automation systems • Troubleshoot system performance issues • Review design documentation Client Engagement • Lead meetings and communicate findings • Build relationships with clients and contractors Operational Contributions • Complete reports and manage time and expenses Team Development • Mentor junior engineers and support training 

What You Bring 

Core Qualifications • Degree in HVACR, Mechanical, Electrical Engineering or related field • 7+ years experience or 3+ years commissioning • Data center experience required Technical Capabilities • Experience with HVAC, controls, automation, fire safety systems • Ability to read construction documents Professional Skills • Strong communication and problem-solving skills Physical Requirements • Ability to work in field environments and lift 30 lbs Preferred • EIT, CEM, OSHA 30, BIM experience 

Travel Requirements 

Travel to project sites as needed based on project demands. 

Why FST 

At FST, we value execution, accountability, and expertise. Engineers have opportunities to gain experience into leadership roles and work on complex, high-impact projects. 

Important Notes 

No visa sponsorship available. Candidates must be authorized to work in the United States. 

Salary range: $130,000 to $150,000FST Technical does not offer employment-based visa sponsorship for this position. Applicants must be legally authorized to work in the United States without the need for employer sponsorship now or in the future.

Powered by JazzHR

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.

pay-wall

FAQs About Senior Mechanical Commissioning Project Engineer-Data Center Construction Jobs at FST Technical Services

What is the work location for this position at FST Technical Services?
This job at FST Technical Services is located in Chicago, IL, according to the details provided by the employer. Some roles may also include multiple work locations depending on the requirement.
What pay range can candidates expect for this role at FST Technical Services?
Candidates can expect a pay range of $130,000 and $150,000 per year.
What employment applies to this position at FST Technical Services?
FST Technical Services lists this role as a Full-time position.
What experience level is required for this role at FST Technical Services?
FST Technical Services is looking for a candidate with "Senior-level" experience level.
What education level is required for this job?
The education requirement for this position is Engineering (PE). Candidates with relevant qualifications or equivalent experience may also be considered.
What benefits are offered by FST Technical Services for this role?
FST Technical Services offers Career Development for this position. Actual benefits may vary depending on the employer's policies and employment terms.
What is the process to apply for this position at FST Technical Services?
You can apply for this role at FST Technical Services either through Sonara's automated application system, which helps you submit applications 10X faster with minimal effort, or by applying manually using the direct link on the job page.