Senior Regional Construction Scheduler
Automate your job search with Sonara.
Submit 10x as many applications with less effort than one manual application.1
Reclaim your time by letting our AI handle the grunt work of job searching.
We continuously scan millions of openings to find your top matches.

Overview
Schedule
Full-time
Education
Engineering (PE)
Career level
Senior-level
Compensation
$170,000-$180,000/year
Benefits
Health Insurance
Dental Insurance
Vision Insurance
Job Description
Description
- Report directly to the Senior Construction Manager of Scheduling and Estimating. Provide various schedule-related reports for upper management to meet Key Performance Milestones.
- Assist in the supervision of Project Schedulers to ensure project timelines are met and interface with OARs, Senior Project Managers and other site staff related to the review of CPM schedules.
- Independently interpret and read detailed construction drawings (Architectural, Structural,
- Mechanical, Electrical, Plumbing, Civil, etc.) and develop a clear understanding of work scope.
- Review Contractor P6 initial Baseline Construction Schedules and identify any missing scope, identify any missing logic or milestones, identify and analyze the critical path, review the required cost loading, and be able to provide written technical schedule review comments based on LAUSD’s structured review templates.
- Review multiple Contractor P6 Monthly schedule updates and provide written schedule review comments that document milestone schedule slippage, critical path activity slippage, and provide over-all schedule analysis based on LAUSD’s structured review templates.
- Perform schedule Time Impact Analysis by using the method of Windows Analysis while incorporating either contemporaneous and/or forensic schedule parameters in a detailed write-up.
- Read drawings to determine if work is in or out of scope and understand terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
- Effectively communicate with the project team regarding any schedule/progress related issues or concerns at regular schedule meetings.
- Develop, maintain, and update various program schedules identifying relationships, logic, milestones, and constraints for construction projects.
- Perform status updates for Program Schedules/Master Schedules on a regular basis.
- Ensure proper use of Program-level standard codes, layouts and reports necessary to ensure data integrity
- Prepare reports as needed and directed by Senior Management.
- Visit construction sites and attend meetings, as needed, and check the Contractor’s monthly schedule progress.
- Minimum ten (10) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects.
- Proficiency in Primavera Latest Version (P6 v19) and MS Office Suite
Required Education
- Graduation from a recognized college or university with a bachelor’s degree in engineering, architecture, construction management, or any related field.
OR
- Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional two (4) years of experience in the duties above to compensate for the required education.
Additional Required Skills
- Excellent written and verbal communication skills
- Superior organizational and planning skills
- Ability to build efficient working relationships with project teams and department staff
- Understanding of theories, principles and practices of cost engineering, scheduling and schedule forensics
CLMI Group is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability, or protected veteran status.
Offered rate of compensation will be based on a variety of non-discriminatory factors, including education, qualifications, experience, and geographic location.
- Salary Range: $170,000 - $180,000
- Health Care Plan (Medical, Dental & Vision)
- Retirement Plan (401k)
- 401k Matching
- Paid Time Off (Vacation, Sick & Public Holidays)
- Short Term / Long Term Disability / Life
Automate your job search with Sonara.
Submit 10x as many applications with less effort than one manual application.
