Element Consulting logo

Senior Regional Construction Scheduler

Element ConsultingLos Angeles, California

$165,000 - $185,000 / year

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.1

Reclaim your time by letting our AI handle the grunt work of job searching.

We continuously scan millions of openings to find your top matches.

pay-wall

Overview

Schedule
Full-time
Education
Engineering (PE)
Career level
Senior-level
Remote
On-site
Compensation
$165,000-$185,000/year

Job Description

Minimum RequirementsRequired Experience:
  • Minimum ten (10) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects.
  • Proficiency in Primavera Latest Version (P6 v19) and MS Office Suite.
Required Education:
  • Graduation from a recognized college or university with a bachelor’s degree in engineering, architecture, construction management, or any related field.
OR
  • Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional two (4) years of experience in the duties above to compensate for the required education.
Required Skills:
  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build efficient working relationships with project teams and department staff
  • Understanding of theories, principles and practices of cost engineering, scheduling and schedule forensics.
Duties:
  • Report directly to the Senior Construction Manager of Scheduling and Estimating. Provide various schedule-related reports for upper management to meet Key Performance Milestones.
  • Assist in the supervision of Project Schedulers to ensure project timelines are met and interface with OARs, Senior Project Managers and other site staff related to the review of CPM schedules.
  • Independently interpret and read detailed construction drawings (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil, etc.) and develop a clear understanding of work scope.
  • Review Contractor P6 initial Baseline Construction Schedules and identify any missing scope, identify any missing logic or milestones, identify and analyze the critical path, review the required cost loading, and be able to provide written technical schedule review comments based on LAUSD’s structured review templates.
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule review comments that document milestone schedule slippage, critical path activity slippage, and provide over-all schedule analysis based on LAUSD’s structured review templates.
  • Perform schedule Time Impact Analysis by using the method of Windows Analysis while incorporating either contemporaneous and/or forensic schedule parameters in a detailed write-up.
  • Read drawings to determine if work is in or out of scope and understand terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Effectively communicate with the project team regarding any schedule/progress related issues or concerns at regular schedule meetings.
  • Develop, maintain, and update various program schedules identifying relationships, logic, milestones, and constraints for construction projects.
  • Perform status updates for Program Schedules/Master Schedules on a regular basis.
  • Ensure proper use of Program-level standard codes, layouts and reports necessary to ensure data integrity.
  • Prepare reports as needed and directed by Senior Management.
  • Visit construction sites and attend meetings, as needed, and check the Contractor’s monthly schedule progress.
Salary dependent on education and experience.  Salary range:  $165K-$185K.

Why Choose Element Consulting?

Element Consulting is a construction management company dedicated to providing clients with responsible and innovative solutions to their project needs, from inception to completion. Based out of El Segundo, CA, the firm offers program, project, and construction management services. We invite you to join us in 'Bringing the Right Elements Together for Our Clients' Success.'

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.

pay-wall

FAQs About Senior Regional Construction Scheduler Jobs at Element Consulting

What is the work location for this position at Element Consulting?
This job at Element Consulting is located in Los Angeles, California, according to the details provided by the employer. Some roles may also include multiple work locations depending on the requirement.
What pay range can candidates expect for this role at Element Consulting?
Candidates can expect a pay range of $165,000 and $185,000 per year.
What employment applies to this position at Element Consulting?
Element Consulting lists this role as a Full-time position.
What experience level is required for this role at Element Consulting?
Element Consulting is looking for a candidate with "Senior-level" experience level.
What education level is required for this job?
The education requirement for this position is Engineering (PE). Candidates with relevant qualifications or equivalent experience may also be considered.
What is the process to apply for this position at Element Consulting?
You can apply for this role at Element Consulting either through Sonara's automated application system, which helps you submit applications 10X faster with minimal effort, or by applying manually using the direct link on the job page.