T logo

Senior Regional Construction Scheduler

The Greenridge GroupLos Angeles, CA

$185,000 - $200,000 / year

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.1

Reclaim your time by letting our AI handle the grunt work of job searching.

We continuously scan millions of openings to find your top matches.

pay-wall

Overview

Compensation
$185,000-$200,000/year

Job Description

The Greenridge Group is a prime contractor and consulting firm specializing in Project and Construction Management for major public-sector agencies.

We are seeking experienced Senior Regional Construction Schedulers to support one of the largest public school construction programs in the nation. This is an excellent opportunity to work on high-impact educational and public works projects while collaborating with senior construction leadership.

Salary Range: $185K/Year-$200K/Year - Dependent on Candidate's Qualifications

Key Responsibilities:

  • Reporting directly to Senior Construction Management (Scheduling & Estimating)
  • Reviewing Contractor Primavera P6 Baseline Schedules
  • Analyzing critical path, milestones, logic, cost loading, and schedule integrity
  • Reviewing monthly schedule updates and documenting schedule slippage
  • Performing Time Impact Analysis (Windows Analysis method)
  • Interpreting construction drawings (Architectural, Structural, MEP, Civil)
  • Evaluating scope and time extension entitlement (compensable vs. non-compensable)
  • Supporting Project Schedulers and collaborating with OARs and Senior PMs
  • Updating and maintaining Program and Master Schedules
  • Preparing executive-level reports
  • Visiting construction sites and attending schedule meetings as needed

Requirements

Experience

  • Minimum 10 years of full-time paid professional experience in construction scheduling
  • Experience with an Owner or General Contractor (public works or educational projects strongly preferred)
  • Strong background in CPM schedule review and schedule forensics
  • Advanced proficiency in Primavera P6 (v19)
  • Strong Microsoft Office skills
  • Deep understanding of:
    • Critical path analysis
    • Cost engineering principles
    • Schedule logic and coding
    • Time impact analysis
    • Schedule forensic methodologies

Education

  • Bachelor’s degree in Engineering, Architecture, Construction Management, or related fieldOR
  • Bachelor’s degree in any field + additional 4 years of relevant scheduling experience

Soft Skills

  • Excellent written and verbal communication
  • Strong organizational and planning abilities
  • Ability to collaborate effectively with cross-functional project teams
  • Detail-oriented with strong analytical mindset

Benefits

We offer one of the most competitive benefit packages in the industry. Our benefits provide a level of personal care and support that only Greenridge can delivery for you and your family's well-being.

  • Medical, Dental & Vision: 100% employer-paid monthly premiums for employees and 50% coverage for dependents under our company-sponsored plan*
  • Life Insurance: Company-paid coverage up to $50,000
  • Paid Time Off (PTO): Accrues up to 80 hours per year with increased accrual based on tenure
  • Sick Leave: 10 days of paid sick leave annually - well above the average of 5-6 days offered by most firms
  • Holidays: 9 paid holidays, 2 floating holidays, and a paid day off for your BIRTHDAY!!!
  • 401(k): Company match up to 4% (100% of the first 3%, 50% of the next 2%)
  • Education Support: Assistance with tuition, licenses, and professional certifications
  • Referral Bonus: Highest employee referral program of $5,000–$10,000 depending on level of hire
  • Extra Paid Leave: For jury duty, bereavement leave, and voting time for local/state/federal elections
  • Client Shutdown Days: Additional paid days off when client offices are closed
  • Equipment: Laptop provided as needed
  • Cell Phone Stipend: $100 monthly stipend for eligible roles

Why Join Greenridge?

  • Be part of trusted leader in delivering impactful public sector projects.
  • Play a meaningful role in shaping safe, modern, high-quality school environments.
  • Join a team of experienced professionals dedicated to public infrastructure excellence.

The Greenridge Group is an Equal Opportunity Employer. We value diversity and do not discriminate based on race, color, religion, sex, sexual orientation, gender identity, national origin, disability, veteran status, or any other protected characteristic under applicable law.

Automate your job search with Sonara.

Submit 10x as many applications with less effort than one manual application.

pay-wall

FAQs About Senior Regional Construction Scheduler Jobs at The Greenridge Group

What is the work location for this position at The Greenridge Group?
This job at The Greenridge Group is located in Los Angeles, CA, according to the details provided by the employer. Some roles may also include multiple work locations depending on the requirement.
What pay range can candidates expect for this role at The Greenridge Group?
Candidates can expect a pay range of $185,000 and $200,000 per year.
What employment applies to this position at The Greenridge Group?
The employer has not provided this information. This may be discussed during the hiring process.
What is the process to apply for this position at The Greenridge Group?
You can apply for this role at The Greenridge Group either through Sonara's automated application system, which helps you submit applications 10X faster with minimal effort, or by applying manually using the direct link on the job page.